RESET IN PROGRESS

FACT - THE WELLS FARGO CURRENCY BOARD HAS BEEN DOWN AND OFF LINE SINCE SATURDAY.

WHEN IT COMES BACK UP WITH THE RESET NUMBERS, WE ARE ON FOR THE BANKING EXCHANGING. THE GREEN LIGHT WILL HAVE BEEN GIVEN.

Donations Request

$740 now needed for second half of September. Your Donation Support For John’s Family Survival Is NOW REQUIRED! I HAVE SOME BILLS DUE THIS WEEK. Use the Pay pal button on the upper left or MOs can be mailed to John MacHaffie, 141 Partridge Circle, Winter Springs, FL 32708

FOREX

WATCH THE FOREX THIS WEEK FOR RESET. DINAR & DONG ARE SUPPOSE TO SHOW UP. GREEN LIGHT FOR GOING TO THE BANK

Easy way to keep up with the Forex Exchange Rates. Notice these are out of CDT with time posted.

IQD - Dinar at: http://www.barchart.com/quotes/forex/%5EUSDIQD

VND - Dong at: http://www.barchart.com/quotes/forex/%5EUSDVND

Monday, December 2, 2013

NEW TROUBLE AT US MARS PRIVATE SHOW - INDIA'S "AVERAGE CAR SIZE PAYLOAD" ON IT'S WAY

The Rumor Mill News Reading Room 

NEW TROUBLE AT US MARS PRIVATE SHOW - INDIA'S "AVERAGE CAR SIZE PAYLOAD" ON IT'S WAY
Posted By: IZAKOVIC [Send E-Mail]
Date: Monday, 2-Dec-2013 09:56:55

Source:

http://www.isro.org/mars/updates.aspx
Date
02-12-2013
Spacecraft has travelled a distance of 5,36,000 km by 17:00 hrs (IST) of Dec 2, 2013. It has crossed the distance to Moon's orbit around Earth (mean distance 3,85,000 km) this morning.
01-12-2013
Medium Gain Antenna of the Mars Orbiter Spacecraft is powered for long distance communication, subsequent to successful Trans Mars Injection (TMI) manoeuvre
Trans Mars Injection (TMI) operations completed successfully. The liquid engine burn time was 1328.89 sec and the imparted incremental velocity was 647.96 m/sec.
Trans Mars Injection (TMI) operations in progress.
Trans Mars Injection (TMI) operation began at 00:49 hrs (IST) on Sunday Dec 01, 2013.
Forward rotation of spacecraft, to put it into the right orientation to perform Trans Mars Injection (TMI) operation has been completed successfully at 00:30 hrs IST on Dec 1, 2013
16-11-2013
The fifth orbit raising manoeuvre of Mars Orbiter Spacecraft, starting at 01:27 hrs(IST) on Nov 16, 2013, with a burn Time of 243.5 seconds has been successfully completed. The observed change in Apogee is from 118642km to 192874km.
12-11-2013
Fourth supplementary orbit raising manoeuvre of Mars Orbiter Spacecraft, starting at 05:03:50 hrs(IST) on Nov 12, 2013, with a burn Time of 303.8 seconds has been successfully completed. The observed change in Apogee is from 78276km to 118642km.
11-11-2013
In the fourth orbit-raising operation conducted this morning (Nov 11, 2013), the apogee (farthest point to Earth) of Mars Orbiter Spacecraft was raised from 71,623 km to 78,276 km by imparting an incremental velocity of 35 metres/second (as against 130 metres/second originally planned to raise apogee to about 100,000 [1 lakh] km). The spacecraft is in normal health. More..
09-11-2013
The third orbit raising manoeuvre of Mars Orbiter Spacecraft, starting at 02:10:43 hrs(IST) on Nov 09, 2013, with a burn time of 707 seconds has been successfully completed. The observed change in Apogee is from 40186km to 71636km.
08-11-2013
The second orbit raising manoeuvre of Mars Orbiter Spacecraft, starting at 02:18:51 hrs(IST) on Nov 08, 2013, with a burn time of 570.6 seconds has been successfully completed. The observed change in Apogee is from 28814 km to 40186 km.
07-11-2013
The first orbit raising manoeuvre of Mars Orbiter Spacecraft, starting at 01:17 hrs(IST) on Nov 07, 2013 has been successfully completed More..
05-11-2013
PSLV-C25, in its twenty fifth flight, successfully launches Mars Orbiter Mission Spacecraft from SDSC SHAR Sriharikota
---
Between us, India's space program chief studied in Croatia. Perhaps that had something to do with Harry Ruppe, Kotnik and other local natives that worked at NASA.
IZAKOVIC
http://www.deepspace4.com

No comments:

Post a Comment